FCEPL deploys 450kW solar system to optimize energy utilization
In a significant step towards achieving a sustainable industrial ecosystem, FrieslandCampina Engro Pakistan Limited has announced the deployment of a 450 kW Solar Photovoltaic (PV) system integrated with a 255 kWh Battery Energy Storage System (BESS)
October 01, 2026 (MLN): In a significant step towards achieving a sustainable industrial ecosystem, FrieslandCampina Engro Pakistan Limited has announced the deployment of a 450 kW Solar Photovoltaic (PV) system integrated with a 255 kWh Battery Energy Storage System (BESS) at its Nara Dairy Farm facility. Awarded to DSG Energy, the project represents a strategic investment in clean energy infrastructure that will s...